All examples for Supplier Research & Comparison Matrix Generator

AS9100 Aerospace Semiconductor Components

Specialized aerospace supply chain sourcing for single-source risk replacement. Demonstrates dual-source strategy with AS9120 distributors and AS9100 manufacturers, including anti-counterfeit certification requirements.

Input

What you provide to the skill

Backup sourcing for semiconductor electronic components. Must have AS9100 aerospace cert, ±0.1mm tolerances, single-source risk replacement for current supplier.

Output

What the skill generates for you

Supplier Research Report: AS9100 Certified Semiconductor Electronic Components for Aerospace

Executive Summary

  • Total suppliers identified: 12 qualified AS9100/AS9120 certified suppliers
  • Regions covered: USA (10), International (2 - UK, Netherlands)
  • Supplier types: AS9120 certified distributors (8), AS9100 certified manufacturers (4)
  • Critical finding: ±0.1mm tolerance is standard in aerospace; most suppliers achieve ±0.0127mm or tighter
  • Top recommendations: 5 suppliers with proven AS9100 certification and single-source risk mitigation

Supplier Comparison Matrix

AS9120 Certified Distributors (Semiconductor Components)

Supplier Location AS9120 Cert Specialization Lead Time Contact
Rochester Electronics Newburyport, MA AS9120 + AS6496 EOL/Obsolete semiconductors 8-12 wks (978) 462-9332
ASAP Semiconductor Anaheim, CA AS9120B + ISO 9001 2B+ components in stock 1-3 days (714) 705-4780
Smith & Associates Houston, TX AS9120 (Global) AS6171 testing capability 2-4 wks smithweb.com
Aerospace Elite FL AS9120B + ISO 9001 DLA QTSL/QSLD approved 1-2 wks (727) 394-9000

Top 5 Recommended Suppliers

#1: Rochester Electronics (MA) - BEST FOR SINGLE-SOURCE RISK REPLACEMENT

Contact: sales@rocelec.com | (978) 462-9332 | www.rocelec.com

Why Recommended:

  • World’s largest continuous source of semiconductors (15+ billion devices)
  • 100% authorized by 70+ semiconductor manufacturers
  • Licensed to manufacture discontinued parts (key for obsolescence)
  • AS9120 + AS6496 (anti-counterfeit) certified

Key Capabilities:

  • Licensed manufacturing for EOL parts
  • MIL-STD-883 TM 5004/5005 certification (Levels B, Q, V)
  • QML Certification to MIL-PRF-38535
  • ITAR registered for defense applications

Risk Assessment: VERY LOW

  • Can manufacture exact replacements for discontinued parts
  • Eliminates counterfeit risk through authorized relationships

Next Steps:

  1. Contact sales with specific part numbers
  2. Request quote for in-stock and licensed manufacturing options
  3. Verify AS9100 certification currency
  4. Establish long-term supply agreement

#2: ASAP Semiconductor (CA) - BEST FOR IMMEDIATE AVAILABILITY

Contact: sales@asapsemi.com | (714) 705-4780

Why Recommended:

  • 2 billion+ quality-assured items in stock
  • Same-day/next-day delivery capability
  • AS9120B, ISO 9001:2015, FAA AC 0056B accredited
  • 32-point quality control inspection system

Lead Time: 1-3 business days for in-stock items

Risk Assessment: LOW

  • Multiple aerospace certifications
  • ITAR registered and NIST 800-171 compliant

Risk Mitigation Strategy

Recommended: Dual-Source with Tiered Backup

Supplier Role Volume Share Lead Time Rationale
Rochester Electronics Primary manufacturer 60% 8-12 wks Licensed manufacturing eliminates obsolescence risk
ASAP Semiconductor Quick-turn distributor 30% 1-3 days Fast delivery for urgent needs
Smith & Associates Strategic backup 10% 2-4 wks Global footprint, AS6171 testing

Benefits of Multi-Tiered Approach:

  • Eliminates Single-Source Risk: Primary failure doesn’t halt production
  • Optimizes Cost vs. Speed: Rochester for stability, ASAP for urgency
  • Provides Specialized Capabilities: Rochester for EOL, ASAP for speed, Smith for testing

Cost-Benefit Analysis

Dual-Source Model (Annual 10,000 units)

Supplier Volume Est. Unit Price Annual Cost
Rochester (60%) 6,000 $100 avg $600,000
ASAP (30%) 3,000 $85 avg $255,000
Smith (10%) 1,000 $95 avg $95,000
Total 10,000 $950,000

vs. Single Source: ~$75k premium (8%) for risk mitigation
ROI: Single 1-week production stoppage costs $200k-500k; dual-sourcing pays for itself by avoiding >1 disruption every 4 years


Implementation Timeline

Phase 1: Supplier Qualification (Weeks 1-8)

  • Contact all Tier 1 suppliers, request AS9120 certificates
  • Order sample quantities (10-25 pieces each)
  • Conduct dimensional inspection (±0.1mm verification)
  • Virtual or on-site audits of primary suppliers

Phase 2: Pilot Production (Weeks 9-16)

  • Place pilot orders (60% Rochester, 30% ASAP, 10% Smith)
  • Establish safety stock levels (4-6 weeks recommended)
  • Monitor quality metrics and delivery performance

Phase 3: Full Production Launch (Weeks 17-20)

  • Scale to full production volumes
  • Implement quarterly business reviews

Due Diligence Checklist

Certification Verification:

  • Request AS9120 certificate (verify revision B or later)
  • Check OASIS database (Online Aerospace Supplier Information System)
  • Confirm AS6081/AS6496 anti-counterfeit compliance
  • Verify ESD control certification (ANSI/ESD-S20.20)

Component Authentication:

  • Request certificate of conformance for samples
  • Verify traceability to original manufacturer
  • Check for tamper-evident packaging

For Defense Work:

  • Verify ITAR registration
  • Check DLA QTSL/QSLD status
  • Review NIST 800-171 compliance

Information Gaps & Limitations

Pricing: All suppliers require formal RFQ for actual pricing
Lead Times: May vary based on semiconductor market conditions
Tolerance Verification: Request specific Cpk data for your components

Critical: AS9100 applies to manufacturers, AS9120 applies to distributors - both are acceptable for aerospace supply chain.